1) Dayton Low Dam Improvements, Dayton, Ohio, 2010-present. Engineer for preliminary design phase for
planned modification to the Dayton Low Dam. Includes design for a canoe by pass, whitewater features and urban design elements in downtown Dayton, Ohio. |
2) Turkey River Improvements, Coralville, Iowa City, Iowa, 2010. REP has been retained by the City to complete
feasibility level work on the removal/modification of an existing low head dam within the city limits. The project
may include a riverside greenway, infrastructure and residential development, and general urban renewal. |
3) Maquoketa River Improvements, Manchester, Iowa 2010-present. Conceptual planning and design for a safety and recreational improvement on a historic low head dam. |
4) Nolan Creek Whitewater and Safety Improvements, Belton, Texas 2010-present. Conceptual planning, de
sign and cost estimating for in-stream improvements and riverside plazas on a two mile stretch of Nolan Creek
through Belton. |
|
5) Blackfoot River Diversion Boating Bypass, Hamilton, Montana 2009-2010. Whitewater bypass design and
construction phase services at the site of an active irrigation diversion. |
6) Cedar River Recreation and Habitat Improvements, Charles City, Iowa 2009-present. Completed Conceptual, Preliminary, and Final Design for a dam removal project. REP acted as the chief planner and designer for this $685,000 project. The project includes the modification of a 6-foot low head dam originally created for aesthetic purposes. The project is slated to be the first whitewater park in Iowa and has paved the way with DNR Iowa Great Places funding. REP worked collaboratively with the Iowa DNR fisheries and floodplain divisions during the permitting process. The five structures included in the design have cutting edge fish passage technology designed by REP and approved by the Iowa DNR. Construction is underway presently. |
|
7) Bear River Improvements, Petoskey, Michigan 2009-present. Lead in-stream design engineer on recreational, habitat and safety improvements on a one mile reach of the Bear River. Construction is underway and will be completed in late 2010. |
8) Siloam Springs Whitewater Park, Siloam Springs, Arkansas 2009-present. Conceptual and preliminary design plan for in-streamwhitewater park. |
9) Arkansas Headwaters Recreation Area Diversion Improvements, Arkansas River Valley, CO. 2008-present.
Chief Engineer on this, Colorado Water Conservation Board, funded plan to improve navigation and safety
through four existing irrigation diversion structures. The Upper Arkansas River is the most rafted river in the US. |
10) Huron River Canoe Bypass, Ann Arbor, Michigan, 2008-2010. Conceptual design and planning for a
safety improvement to the Argo Dam in Ann Arbor. Final design and construction planned for 2011. |
|
11) Hamilton Dam Improvement, Flint, Michigan, 2008-2010. Conceptual design and planning for safety, environmental and recreational improvements at the Hamilton Dam on the Flint River. |
12) Little Salmon River Whitewater Improvements, Riggins, Idaho. 2008-2010. Conceptual planning through
preliminary design and permitting for in-stream improvements to the Little Salmon River in Riggins.. |
13) Mad River Whitewater Park, Dayton, Ohio 2007-Present. Lead Engineer for conceptual design, engineeringand permitting on this whitewater park project. Includes whitewater, trail, access and habitat improvements in Eastwood MetroPark. |

|
14) Kent RiverEdge Park, Kent, Ohio 2007-2008. Planner/Designer for access and whitewater improvements on the Cuyahoga River near the historic Kent Dam. |
15) Kelly's Whitewater Park, Cascade, Idaho 2006-2010. Planner and Engineer for the first in-stream whitewater park in the state of Idaho on the North Fork of the Payette River. Drops, pools and a learning channel are complimented by a $1million visitor's center. Completed at the site of a abandoned sawmill. |
16) Bend Paddle Trail, Bend, Oregon. 2006-2010. Planner/Engineer for a feasibility study that analyzed a series of low head dams on the Deschutes River. Conceptual and preliminary design were completed for the Colorado Street Dam and final engineering/permitting is planned for 2011. |
17) San Marcos Dam Modification and Whitewater Improvements Project, San Marcos, TX 2006. Completed design and construction services for safety, fish passage and recreational whitewater improvements to the Rio Vista Dam on the San Marcos River. |
18) Saskatoon Whitewater Improvements Project, Saskatoon, Canada, 2006. Completed a conceptual plan for a dam modification and safety improvements on the South Saskatoon River. |

|
19) Oklahoma City Whitewater Improvements, Oklahoma City, OK, 2006. Completed a conceptual plan for a dam modification and safety/whitewater improvements as well as a pumped whitewater park. |
20) Salmon River Whitewater Park, Salmon, ID, 2005-present. Completed a conceptual plan for a Whitewater
Park on the Salmon River. Preliminary design and permitting underway in the Fall of 2010. |
21) Rock Park Whitewater Park, Sparks, NV 2005-2008. Hydraulic design and construction administration for this whitewater park on the Truckee River downstream of Reno, Nevada. |
|
22) Fulton Diversion on the Chewucks River, Winthrop, WA, 2005-2006. Completed conceptual planning for
whitewater improvements. |
23) Whitewater Park on the Yakima and Naches Rivers, Yakima, WA, 2005. Completed conceptual planning for whitewater improvements. |
24) Durango Boating Park, Durango, CO, 2005. Completed conceptual design and planning for improvements to the former Smelter Boating Park on the Animas River. Includes RICD application and final design. |
25) Brisbane Whitewater Park, Brisbane, Australia, 2005-present. Completed
a conceptual plan for 3 whitewater sites on the Brisbane River. |
26) Buena Vista River Park, Buena Vista, CO, 2005-present. Provided design and construction services for this whitewater park that was constructed along a new residential development. The most recent phase of construction was completed in early 2010. |

|
27) Lawson Whitewater Improvements, Lawson, CO, 2005-2010. Completed the design, permitting and construction for whitewater improvements on Clear Creek in Lawson, Colorado, 30 miles west of Denver. |
28) Barren River Whitewater Park, Bowling Green, TN, 2005-2006. Worked with the US Army Corps of Engineers to complete a conceptual plan for whitewater improvements on the Barren River. |
29) Carson River Recreation Plan, Carson City, NV, 2005-2006. Completed a Master Plan formodifications to 3 dams on the Carson River |

|
30) Spokane Whitewater Park, Spokane, WA, 2005-present. Completed
a conceptual plan and preliminary design for whitewater improvements on the Spokane River.. |
31) Ouachita River Whitewater Improvements Project, Malvern, AR, 2005-2006. Completed a conceptual plan
and design for whitewater improvements on the Ouachita River. |
32) Blue River Whitewater Park, Silverthorne, CO, 2005. Completed a conceptual plan and RICD application for the Blue River Whitewater Park. |
33) Nantahala Whitewater Enhancements, Bryson City, NC, 2005. Completed a conceptual plan for enhance ments to the Nantahala River Whitewater Park. |
34) Rio Salado Whitewater Park, Tempe, AZ, 2004-2005. Completed a conceptual plan for a pumped whitewater course. |

|
35) San Juan River Restoration Project, Pagosa Springs, CO, 2004-2009. Completed the San Juan River Master Plan, including design and construction of whitewater improvements. The first feature was completed in the spring of 2008. |
36) Oil Creek Whitewater Park, Oil City, PA, 2004-2005. Completed a feasibility study, conceptual design and cost estimate for a large in-stream project on the Allegany River. |
37) Buck Creek Improvements Project, Springfield, OH, 2004-present. Lead engineer and planner for safety,
navigability and recreational whitewater improvements to Buck Creek. The firsttwo of four dam modifications
were completed in May of 2010. The remainder of the sites are planned for 2011. |

|
38) Black River Whitewater Improvements Project, Watertown, NY, 2004-2006. Completed a conceptual plan
for whitewater improvements and river access, along with a Master Plan for the Black River. Completed access
trail through a cliff band to the world famous Route 3 Wave. |
39) Colorado River Park Improvements, Newcastle, CO, 2004. Completed a Master Plan for whitewater improvements on the Colorado River in Newcastle. |
40) Rogue River Whitewater Improvements Project, Grant's Pass, OR, 2004. Completed conceptual planning for whitewater improvements on the Rogue River. |
41) US National Whitewater Center, Charlotte, North Carolina, 2003-2006. REP was the engineer for this pumped, artificial, whitewater park which is home to the US National Canoe & Kayak Team. This $37million facility is the first of its kind in the US and involves pumping 1200cfs continuously through three channels. |
42) Greenhouse Park Whitewater Improvements, Johnstown, PA, 2003-2007. Provided design and construction services for the completion of a whitewater park on Stony Creek in Johnstown. This park included extra attention to handicap river access. |
|
43) Terrant County Water District Low-Head Dam Refit, Ft. Worth, TX, 2003. As special consultants to the
water district, REP helped to rebuild three existing low-head dam structures. Design improvements included the re-shaping of the dams in order to create usable whitewater features and improved boat passage while maintaining head and capacity in the waterway. |
44) Boise River Whitewater Park, Boise, ID, 2003. Completed a conceptual design for a river recreation park in
Boise. The design includes in-stream modifications for a slalom course, freestyle features and recreational amenities. Also included was an intricate lakes waterway system that could become a one of a kind public park. |
45) Oroville Whitewater Park, Oroville, CA, 2003. Completed a preliminary design of this multi-million dollar
facility in cooperation with Kennedy-Jenks Engineering. This park boasts more than 90 feet of drop that circumnavigates a massive diversion in the Feather River. |
|
46) Big Wood River, Sun Valley, ID, 2003. Completed a preliminary design and cost estimate for a whitewater
|park on the Big Wood River. |
47) Longmont Whitewater Park, Longmont, CO, 2003. Chief planner, designer, and engineer for this river park.
REP has worked with the City's Master Planning committee to integrate a whitewater park design with the City's
greenways system. Work included preliminary design, cost and quantity estimates and work with the CWCB to
establish a water right for this community park. |
48) Carbondale Whitewater Park, Carbondale, CO, 2003. Worked with a local planner to investigate the feasibility and prepare preliminary designs for a river corridor gateway park for the Town of Carbondale. Plans included modifications to an existing slalom course and the intertwining of new riverside walkways with new playboating and recreational boating amenities. |
49) Asheville Whitewater Park, Asheville, NC, 2003. Worked with a local foundation to create a preliminary design and cost and quantity estimate for a whitewater park on the French Broad River. |
50) Trinity River Whitewater Park, Dallas, TX, 2002-2005. Completed Master Planning for river reconstruction,
restoration, trails, greenways, and flood improvements. Included a separate whitewater channel and in-stream whitewater feature. |

|
51) Brennan's Wave Project, Missoula, MO, 2002-2006. Completed the design, permitting and construction for whitewater improvements on the Clark Fork River. Construction was completed in spring 2006. US National Freestyle Team selection event was held at this site in July of 2010. |
52) North Platte River Whitewater Improvements Project, Casper, WY, 2002-2005. Completed bank stabilization, river restoration and whitewater improvements on the North Platte River at the abandoned
Casper Refinery for this $1.5 million project. Funding for this major oil-cleanup effort was provided by BP/Amoco. The project included a dam removal and cooperation between several agencies. |
53) Colorado River Whitewater Park Conceptual Plan, Glenwood Springs, CO, 2002-2003. Completed a conceptual plan for improvements to the Colorado River and river trail system in Glenwood Springs. |

|
54) Fall River Whitewater Park, Estes Park, CO, 2002-2003. Designed and oversaw the construction of whitewater improvements, an amphitheater, new walkways and an enhanced riparian zone in downtown
Estes Park, just outside of the Rocky Mountain National Park. Work included numerous whitewater structures designed for playboating and enhanced by recommendations from the Division of Fish and Wildlife to include dramatic fish habitat improvements. |
55) Fox River Whitewater Park, Evanston, IL, 2002. Created prelimi
nary designs for safety and whitewater improvements to an existing low-head dam. |
56) Bow River Weir Modifications, Calgary, Canada, 2001-present. Completed a conceptual plan, physical modeling and design for the fish passage and safety/whitewater improvements components of modifications to this diversion dam on the Bow River. Construction is underway and will be complete in the Spring of 2011. This is the largest in-stream whitewater park in North America. |
57) Arkansas Fish Passage and Whitewater Safety Improvements, Pueblo, CO, 2001-2005. Chief planner and designer this $1.2million whitewater park. The project included the modification of a 12-foot diversion dam intoa passable whitewater rapid. The resulting rapid provides whitewater that is passable to fish and is a safety improvement for human boat traffic while maintaining head for the existing diversion. Chief Engineer Gary Lacy also worked with the City in an effort to establish a water right for this facility. |

|
58) Bear River Whitewater Improvements Project, Evanston, WY, 2001-2006. Chief planner, designer, and engineer for this $500,000 river park. The project included state-of-the-art whitewater improvements, stream
bank restoration and access, and overall site improvements. |
59) Yampa River Whitewater Improvements Project, Steamboat Springs, CO, 2001-2005. Completed conceptual planning, design and construction of whitewater improvements on the Yampa River. Includes
dynamic whitewater features and continuous bike trail. |

|
60) Lyons Whitewater Park, Lyons, CO, 2001-2002. Chief planner, designer, and engineer for this $100,000 river park. The project is a stunning natural river park that includes a swimming hole, beautiful flagstone rock set at the base of towering red-rock cliffs, and a number of great playwaves and holes. |
61) Blue River Whitewater Park, Breckenridge, CO, 2000-2002. Chief planner, designer and engineer on this $300,000 river park. This project was unique in that, though the channel existed prior to the project, there was no river there. The Blue River was restored to its natural channel, and more than 16 structures were included for both slalom and freestyle. This park is tied in with an existing pond and wrapped around the City's recreational center in a project that combines the stunning architecture of Breckenridge with the natural beauty of a restored river park. |
62) Colorado River Whitewater Park, Palisade, CO, 2000-2006. Completed a conceptual plan and cost estimate for improvements to the Colorado River. The design incorporated endangered fish passage and whitewater safety and navigability improvements. |
63) Truckee River Whitewater Park, Reno, NV, 1999-2004. Chief planner, designer, and engineer of a plan funded by the Nevada Commission on Tourism to restore and integrate the Truckee River into the urban fabric of downtown Reno. Key aspects of this project at Wingfield Park include a whitewater slalom course and riverside trails, plazas, and esplanades which mesh with in-stream improvements and adjacent commercial activity. |

|
64) Animas River Whitewater Improvements Project, Farmington, NM, 1999-2000. Chief planner, designer, and engineer for this $100,000 project, which included modification of an unsightly diversion structure made of dumped concrete and rubble. The river restoration included the diversion of water using naturally appearing
features, which provide in-stream habitat for endangered fish species. |
65) Gunnison River Whitewater Park, Gunnison, CO, 1999-present. Chief planner, designer, and engineer for
this $200,000 river park. The project included state-of-the-art whitewater improvements, stream bank restoration and access, and overall site improvements. The first phase of this project was completed in the Fall of 2002. The most recent phase is underway and construction is planned for Fall of 2010. |
|
66) South Platte River Whitewater Park, Denver, CO, 1999. Chief planner, designer, and engineer for a white\
water park in the downtown Denver river corridor. This project was part of a major park construction, which
includes revisions to existing flood-control drop structures. |
67) Gore Creek Whitewater Park, Vail, CO, 1999-2002. Chief planner, designer, and engineer for this $200,000river park. The project, which is located in the pedestrian village in downtown Vail, included creative park andbank improvements and featured natural boulder drop structures. |
68) Salida Whitewater Park, Salida, CO, 1999-present. Chief planner, designer, and engineer of a plan funded
by the Arkansas River Trust and City of Salida. The design included natural-appearing whitewater improvements to restore the river and provide economic and recreational benefits to the downtown area. A key aspect of the project was the whitewater course at the site of the longest-running whitewater kayak race in North America, FIBArk. The project hosted the 2009 US Freestyle kayaking national |
69) Kern River Whitewater Improvements Project, Bakersfield, CA, 1998-2004. Chief planner, designer, and
engineer. Project included investigation and feasibility analysis of two whitewater park sites, each of which will
feature slalom course and fish habitat improvements. One site was a candidate for the Year 2000 National Whitewater Championships. |
70) Clear Creek Whitewater Park, Golden, CO, 1996-2010. Chief planner, designer, and engineer for this
ground breaking river park. Located in downtown Golden on Clear Creek, it included state-of-the-art whitewater
improvements, stream bank restoration and access, and overall site improvements. The first phase of this
project was completed and dedicated in Spring 1998. A second phase was completed in 2004 and additional features have been added through the spring of 2010. |
|
72) "Punt the Creek" Project, Platte River Greenway Foundation, Denver, CO, 1994-1999. Chief design engineerfor a unique tourism attraction for downtown Denver's Cherry Creek. The project features Venetian-style gondolas and rotating dams and locks, together with flood erosion protection. The project is the winner of the1996 Downtown Denver Annual Award. |
73) Goose Creek Boat Chute Feasibility Study, Sheridan, WY, 1992. Produced alternative evaluation for various
boat chute configurations for a dangerous drop structure. |

|
74) Roaring Fork River Trail and Whitewater Course, City of Aspen, CO, 1990-1992. Provided planning and design services, including site planning and design, environmental restoration and resource protections. Provided cost estimates, bid documents, and construction supervision. Also elicited public input, secured local funding, and obtained approvals from local, state and federal officials. |
75) Boulder Creek Whitewater Course, City of Boulder, CO, 1990- 2010. Obtained a grant from the City of Boulder Parks Department to construct a whitewater kayak course on Boulder Creek. The project included reconstruction of a 1/4 mile section of the Creek to create a series of small drops and pools that allows boating at very low flows. The project also included construction of 25 semi-permanent slalom gates. The overall project is a $3 million greenway and urban trail system. |
76) Clear Creek Master Plan, City of Golden, CO, 1987. Developed a Master Plan for the two mile Clear Creek Corridor as it passes through academic, residential, urban and industrial areas of downtown Golden. Trail, in-channel, public facility, and park improvements have become part of the revitalized area of the Creek. |
77) Boat Landing and Pocket Park, Salida, CO, 1986-1987. Design engineer and project manager for an intownriver boat landing and mini whitewater park on the Arkansas River. The project was built with a grant
from the Coors Company. |
|
78) Arkansas River Boat Chute at the Mt. Shavano Fish Hatchery, Salida, CO, 1986-1987. Completed design
and construction of a navigable dam bypass on the Arkansas River near Salida, Colorado. This assignment from the Colorado Division of Wildlife included final design, implementation, and coordination of State and local
agencies. The design team helped to secure a state energy impact grant for the chute. Related boating access
improvements were also included in this project. |
79) Union Avenue Whitewater Boating Bypass, Denver, CO, 1985-1989. Designer for the $1 million whitewater
boating bypass project on the South Platte River at Union Avenue. This assignment from the Colorado Water Conservation Board included performance evaluations for multiple design alternatives, design, and the obtainment of approvals from many jurisdictions. |

|
80) South Platte River Master Plan, Urban Drainage District, Denver, CO, 1983. Provided resource inventory,
input solicitation, planning, preliminary design and cost estimates for construction and maintenance of parks,
natural areas, bike and pedestrian paths, access points, river improvements, and fish-wildlife habitat
improvements along the South Platte River. |
81) Miscellaneous Boat Chutes, Denver, CO, 1983-1987. Designed and model-tested safety improvements
installed in the Platte River-3rd Avenue Dam boating bypass structures. |
|
|